Clearing the land.
Land was blended
Piling was placed. Please refer to step 6 for the height description.
Home
About the Company Product About Pitaya Tools used The farm processes Company Contact info.
2009 © Great Sun Pitaya Farm Sdn Bhd. All rights reserved.
(1)
(2)
(3)
(4)
(5)
(6)
(7)

Tractor use to push the soil slightly higher. Rows of higher soil formed along with the piling.

The rows of raised soil will be separated into points. Each piling represent a point.
The first time fertilizer will be place and manual blend it with the soil.
The pitaya's branches will be plant. Each point contains 4 branches. It will be plant 50mm into the soil. Later, the branches will be tied up to the piling to avoid falling and as a guide to grow upward.
After step 7, Wait for 2 to 3 times of heavy rain in a week. If it does not rain, please do water the plant manually. The above picture shows the complete planted pitaya trees.
(8)

FARM PROCESS